Galleries > SMG Pictures
Image 97 / 149

Image 97 / 149
The up platform at has been strimmed and the gate is nearly clean ready for painting. The remains of the down platform shelter are visible beyond.
Taken on 02/03/2013 by Sue Baxter
Galleries > SMG Pictures
Image 97 / 149 The up platform at has been strimmed and the gate is nearly clean ready for painting. The remains of the down platform shelter are visible beyond. |
© 2011 - 2025 Dartmoor Railway Association Top ^