Galleries > Gallery Lab11
Image 25 / 38

Image 25 / 38
Showing the start that has been made on replacing the coach ceiling with the insulation pads in place and the first two side panels positioned.
Taken on 18/07/2013 by Geoff Horner
Galleries > Gallery Lab11
Image 25 / 38 Showing the start that has been made on replacing the coach ceiling with the insulation pads in place and the first two side panels positioned. |
© 2011 - 2025 Dartmoor Railway Association Top ^